Discover how a bimodal integration strategy can address the major data management challenges facing your organization today.
Get the Report →Connect to Microsoft Project Data and Transfer Data in Talend
Integrate Microsoft Project data with standard components and data source configuration wizards in Talend Open Studio.
This article shows how you can easily integrate the CData JDBC driver for Microsoft Project into your workflow in Talend. This article uses the CData JDBC Driver for Microsoft Project to transfer Microsoft Project data in a job flow in Talend.
Connect to Microsoft Project in Talend as a JDBC Data Source
You can follow the procedure below to establish a JDBC connection to Microsoft Project:
- Add a new database connection to Microsoft Project data: To add a new connection, expand the Metadata node, right-click the Db Connections node, and then click Create Connection.
- In the resulting wizard, enter a name for the connection.
On the next page, select Generic JDBC from the DB Type menu and enter the JDBC URL.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, you will need to specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
Built-in Connection String Designer
For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.
java -jar cdata.jdbc.microsoftproject.jar
Fill in the connection properties and copy the connection string to the clipboard.
A typical JDBC URL is below:
jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
- Enter the path to the cdata.jdbc.microsoftproject.jar file, located in the lib subfolder of the installation directory.
- Right-click the connection and then click Retrieve Schema.
- Click Next with the default options to select the tables you want to import.
- Finish the wizard with the default options.
Output the Projects Table to a Flat File
You can follow the procedure below to transfer the Projects table to a flat file output component:
- In the Table Schemas node, drag the tables to the workspace.
- In the dialog that is displayed, select the tJDBCInput component.
- Next, drag a tFileOutputDelimited component from the Business Intelligence tab of the Palette into the workspace.
- Right-click the Projects tJDBCInput component and drag a vector to the output file.
Run the project to transfer the data.