MS Project Connector for MuleSoft

SQL-Centric MuleSoft Connectivity to Microsoft Project

Leverage the power of SQL to simplify integration with Microsoft Project. Our Microsoft Project Connector for MuleSoft includes a robust SQL engine that simplifies data connectivity and allows users to accomplish complex data manipulation without extensive transformation workflow.

  • Write SQL, get Microsoft Project data. Similar to the MuleSoft Database Connector, but for Microsoft Project.
  • Powerful SQL Engine with support for dynamic queries, streaming, bulk operations, metadata discovery, query folding, and more.

  buy now
MS Project MuleSoft Anypoint Connector



SQL Access to Microsoft Project From MuleSoft

Connecting to Microsoft Project is as easy as connecting to a database



Microsoft Project

The MS Project MuleSoft Connector provides the easiest way to connect with Microsoft Project data from MuleSoft workflow. The Connectors leverage a straightforward design, similar to the MuleSoft Database Connector, that makes it easy to import, export, backup, analyze, transform, & connect-to your Microsoft Project data.


Standard MuleSoft Connectors



The Microsoft Project Connector for MuleSoft is a fully-integrated standard Connector featuring seamless integration with the Anypoint designer, dynamic input and operation through DataSense, support for complex projections, streaming, bulk operations, and more!

            
				
				
					#["SELECT * FROM $(vars.table) WHERE name = :name"]
					
						#[{'name' : payload}]
					
				
          

Type SQL, Get Microsoft Project



Write standard SQL queries to interact with Microsoft Project, just like working with any RDBMS. Supports joins, updates, aggregation, etc.

SELECT WITH INNER JOIN

SELECT Projects.Id, Projects.Name, Projects.Fax,
  Opportunity.AccountId, Opportunity.CloseDate
FROM Projects
INNER JOIN Opportunity
  ON Projects.Id = Opportunity.AccountId

AGGREGATE FUNCTIONS

SELECT Name, AVG(AnnualRevenue) FROM Projects GROUP BY Name

CRUD OPERATIONS

UPDATE Projects SET Name='John' WHERE Id = @myId

Key Features

  • Data-Centric Operations (SQL Access to Data)

    CData Connectors for MuleSoft function in a similar way to the Mule 4 Anypoint Connector for Database. They interoperate with MuleSoft DataWeave to offer dynamic data access from MuleSoft workflow.

  • Fully-Dynamic Queries

    Users can parameterize all parts of the Query passed to the Connector. This capability includes the WHERE clause as well as the ability to parameterize parts of the query itself.

  • Streaming & Bulk Operations

    Connectors support data streaming and bulk operations by default, making operations over large datasets fast and efficient. The connectors include integrated paging that streamlines data access, and support bulk and batch operations for reading and writing.

  • Intelligent Query Folding

    Improved performance through intelligent query folding. Connectors push data operations server-side wherever possible to improve execution performance. Operations that cannot be executed server side are handled client-side by the robust embedded SQL Engine.

  • Metadata Discovery

    Extensive schema discovery capabilities. Explore tables, columns, keys, and other data constructs based on user identity.

  • Replication and Caching

    Our replication and caching commands make it easy to copy data to local and cloud data stores such as Oracle, SQL Server, Google Cloud SQL, etc. The replication commands include many features that allow for intelligent incremental updates to cached data.

  • String, Date, & Numeric Function

    Includes a library of 50 plus functions that can manipulate column values into the desired result. Popular examples include Regex, JSON, and XML processing functions.

  • Collaborative Query Processing

    Connectors enhance the data source's capabilities with additional client-side processing, when needed, to enable analytic summaries of data such as SUM, AVG, MAX, MIN, etc.

  • Customizable and Configurable

    Data models can easily be customized to add or remove tables/columns, change data types, etc. without requiring a new build. Customizations are supported at runtime using human-readable schema files that are easy to edit.

  • All-in-One Deployment

    Standard MuleSoft Connectors that can be easily deployed to any supported MuleSoft platform.


Download Microsoft Project Connector for MuleSoft Now


Fast-track your next MuleSoft integration to Microsoft Project. Standard SQL interfaces provide a familiar interface to Microsoft Project, and shield systems integrators from the complexities of data access.


  download