Microsoft Project Tableau Connector

Easily connect Tableau with live Microsoft Project data for up-to-date visual analysis and reporting.

  • Real-Time Data Access
  • Full Metadata Discovery
  • Robust SQL-92 Support

  download   buy now



 Certified Data Connectivity




Add Microsoft Project Connectivity to Tableau

A powerful set of certified data connectors that simplify the process of accessing enterprise data in real-time. Connect with Microsoft Project data from Tableau Deskop, Tableau Server, & Tableau Data Management solutions.

Full Metadata Discovery

Intelligent rowscan, type detection, relationship exploration and support for unstructured data.

Robust SQL-92 Engine

Rich SQL-92 engine with support for bulk operations, push-down, client functions, and aggregation

Unmatched Performance

Optimized performance down to the socket level, our drivers offer unmatched performance.

Enterprise-Class Security

Advanced Security and Authentication. Secure TLS / SSL data encryption.


Certified Tableau Connectivity

  • 100% Certified Tableau Connectivity

    Native Tableau Connectors seamlessly integrate with Tableau BI and Data Prep to enable real-time data connectivity with Microsoft Project.

  • Comprehensive Metadata Discovery

    Extensive schema discovery capabilities for Microsoft Project. Explore tables, columns, keys, and other data constructs based on user identity.

  • Flexible NoSQL flattening

    Easily connect Tableau directly with complex heirarchical data through flexible and extensible NoSQL flattening.


    Learn more: Parsing Hierarchical Data

  • Blazing Data Connectivity

    Our drivers push the boundaries of data access, optimizing socket-level streaming and compression capabilities, and delivering truly exceptional data access.


    Learn more: Unmatched Performance

  • Easily Customizable and Configurable

    The data model exposed by our Tableau Connectors can easily be customized to add or remove tables/columns, change data types, etc. without requiring a new build. These customizations are supported at runtime using human-readable schema files that are easy to edit.

  • Enterprise-class Security

    Includes standard Enterprise-class security features such as TLS/ SSL data encryption for all client-server communications.

Complex Query Processing

The CData Microsoft Project Connector contains an embedded SQL Engine that pushes supported SQL operations to the data source and processes unsupported operations client-side (Query Folding).

  • Issue complex queries using SQL-92 compliant operations and clauses.
  • Leverage server-side data processing for supported operations.
  • Build new relationships and custom datasets.

High-Performance Data Delivery

Our Microsoft Project Tableau Connector is capable of delivering exceptional real-time data access. All of our Tableau Connectors are based on a highly-efficient query engine that has been optimized down to the socket level with streaming and compression capabilities.

  • Enable real-time analytics through unmatched data processing.
  • Request data as quickly as possible using server-side paging and bulk capabilities.

Download the Microsoft Project Connector


Building custom dashboards & reports that connect with live Microsoft Project data has never been easier. Download the CData Tableau Connector for MS Project now, and get connected.


  Download Now