MS Project ODBC Driver
Read, write, and update Microsoft Project through ODBC
The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity. Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.
See what you can do with Microsoft Project ODBC Driver
Server
Connect to Microsoft Project from SQL Server as Linked-Server. You can query Microsoft Project from familiar Transact-SQL without need of setting up another application.
Integrate Microsoft Project to your system through popular ETL / EAI tools such as Informatica PowerCenter. Standard SQL and Stored Procedures enable fast delivery of your integration projects.
Connect Microsoft Project from any ODBC compatible tools:
Desktop
Your familiar tools can connect to Microsoft Project using CData ODBC.
- Microsoft Access
- Power Query
- DBeaver
- and more
Microsoft Project ODBC Connectivity Features
- Fully compatible with Microsoft Project Web Apps and Microsoft Project on Office 365
- SQL-like access to your MS Project data, including custom fields
- Powerful metadata querying enables SQL-like access to non-database sources
- Push down query optimization pushes SQL operations down to the server whenever possible, increasing performance
- Client-side query execution engine, supports SQL-92 operations that are not available server-side
- Connect to live Microsoft Project data, for real-time data access with the Microsoft Project Python Connectors
- Full support for data aggregation and complex JOINs in SQL queries
- Secure connectivity through modern cryptography, including TLS 1.2, SHA-256, ECC, etc.
- Seamless integration with leading BI, reporting, and ETL tools and with custom applications via the Microsoft Project Connector.
Target Service, API
The driver connects to Microsoft Project Online. Project management platform.
Schema, Data Model
Models Project objects as tables. Project and resource management focus.
Key Objects
Projects, Tasks, Resources, Assignments, and Timesheets. PPM data model.
Operations
Full CRUD on project data. Resource allocation. Timeline management.
Authentication
OAuth 2.0 authentication. Project Web App access required.
Start a 30-day Free Trial Today
Robust ODBC Access to Microsoft Project
Full-featured and consistent SQL access to any supported data source through ODBC
-
Standards-Compliant ODBC
ODBC 3.8 compliant native protocol based drivers.
-
Unicode, 32-bit and 64-bit support
Support 32-bit and 64-bit applications and unicode ODBC APIs.
-
Cross-platform ODBC (Windows/Linux/Mac)
Available for Microsoft Windows, Unix, and Mac (macOS / OS X) platforms.
-
Certified ODBC Compatibility*
Our drivers undergo extensive testing and are certified to be compatible with leading analytics and reporting applications like Tableau, Microsoft Excel, and many more.
* Please visit our knowledge base to access how-to articles. -
Embedded Remoting Capabilities
Our exclusive Remoting feature allows hosting the ODBC connection on a server to enable connections from various clients on any platform (Java, .NET, C++, PHP, Python, etc.), using any standards based technology (ODBC, JDBC, etc.). ODBC Remoting is enabled using the popular MySQL and SQL (TDS) wire protocol server.
-
String, Date, Numeric SQL Functions
The driver includes a library of 50 plus functions that can manipulate column values into the desired result. Popular examples include Regex, JSON, and XML processing functions.
-
Collaborative Query Processing
Our drivers enhance the data source's capabilities by additional client-side processing, when needed, to enable analytic summaries of data such as SUM, AVG, MAX, MIN, etc.
-
Easily Customizable and Configurable
The data model exposed by our ODBC Drivers can easily be customized to add or remove tables/columns, change data types, etc. without requiring a new build. These customizations are supported at runtime using human-readable schema files that are easy to edit.
-
Enterprise-class Secure Connectivity
Includes standard Enterprise-class security features such as TLS/ SSL data encryption for all client-server communications.
-
Replication and Caching
Our replication and caching commands make it easy to copy data to local and cloud data stores such as Oracle, SQL Server, Google Cloud SQL, etc. The replication commands include many features that allow for intelligent incremental updates to cached data.
Connect to Microsoft Project — empower every team
- Easiest way to connect to Microsoft Project
- Dashboard / Reports that connect with Microsoft Project
- Data drives business, but IT teams are overwhelmed by accessing numerous siloed sources like Microsoft Project. CData ODBC Drivers offer the fastest, easiest way to connect Microsoft Project to BI tools like SAP BusinessObjects, Crystal Reports, Qlik, or Access.
Integrate Microsoft Project to your system:
- Custom application integration with SQL
- SQL Server Linked Server
- Informatica PowerCenter
Need to integrate your internal systems with Microsoft Project? CData ODBC Drivers let you do it easily—access Microsoft Project as a SQL Server Linked Server or connect via tools like Informatica PowerCenter using an SQL-based driver, no extra middleware required.
- Data Client of your choice
- Excel, MS Access Linked-table, PowerQuery
Still exporting and importing CSVs manually or with scripts? CData ODBC Drivers give you live access to Microsoft Project — no middleware or files needed. Use your preferred tools and stay in control of your Microsoft Project data.
AI-Assisted Development with CData Code Assist MCP
Build Microsoft Project integrations faster with AI that understands your schema
Supported AI Coding Tools
Schema-Aware AI
Code Assist MCP gives AI coding tools direct access to your Microsoft Project schema. No more guessing table names or column types—AI sees the same metadata as your JDBC Driver.
Same Schema, Same SQL
Table names, column names, and SQL syntax in Code Assist MCP are identical to this JDBC Driver. Queries you validate with AI work directly in your production code.
From Prototype to Production
Stop guessing. Start shipping. Prototype queries in conversation, validate against live data, then deploy with CData JDBC Drivers—no rewriting required.
Free for development. No trial period. No credit card required.
Frequently Asked Microsoft Project ODBC Driver Questions
Learn more about Microsoft Project ODBC drivers for data and analytics integration
Does Microsoft Project support ODBC?
Not natively. However, CData offers an ODBC driver for Microsoft Project that allows you to connect to Microsoft Project data from any ODBC-compliant application, just like you would access a traditional database. This can be useful for tasks like:
- Accessing Microsoft Project from applications: Connect to Microsoft Project data in popular tools and applications including Microsoft Excel, Tableau, Power BI, and many others.
- Real-time data: You can work with live Microsoft Project data within these applications, enabling tasks like reporting and analysis.
- Connecting systems: Build data integrations between Microsoft Project and other systems.
The Microsoft Project ODBC driver is an ODBC 3.8 compliant native protocol-based driver with comprehensive ANSI SQL-92 support. This means that virtually any application that can connect to data via ODBC, can use the CData ODBC driver for real-time integration. Download a fully functional free trial of the Microsoft Project ODBC driver today to get started.
Is there an ODBC driver for Microsoft Project?
Yes, the CData ODBC driver for Microsoft Project provides universal ODBC data connectivity for Microsoft Project. The Microsoft Project ODBC driver offers a simple SQL-based layer of abstraction that simplifies real-time data access for users and applications, enabling them to communicate with Microsoft Project using a standardized set of functions. Virtually any application on any platform (including Windows, macOS, or *nix) can use the CData ODBC driver for real-time integration.
How do I connect to Microsoft Project via ODBC?
Connectivity to Microsoft Project via ODBC is easy. First, download and install the Microsoft Project ODBC driver. The download page includes separate installers for Windows, macOS, and Unix, so please select the Microsoft Project ODBC driver that matches the platform where you intend to use the driver.
Once the installation is complete, navigate to the ODBC driver documentation page. Here, you'll find a wealth of information about the installed driver. The step-by-step instructions for creating a DSN and using it to connect to Microsoft Project via ODBC are just the beginning. The documentation also provides extensive configuration details for using the Microsoft Project ODBC driver with all your favorite applications and development tools, ensuring you have all the support you need.
Where can I download an ODBC driver for Microsoft Project?
All of the CData ODBC drivers, including the Microsoft Project ODBC driver are available for download online. To get started, download a fully functional free trial of the Microsoft Project ODBC driver today.
How do I install an ODBC driver for Microsoft Project?
To install the Microsoft Project driver, simply download one of the Microsoft Project ODBC driver installers available online. The download page includes separate Windows, macOS, and Unix installers, so please select the Microsoft Project ODBC driver that matches the platform where you intend to use the driver. The installers are comprehensive setup utilities that will install all the components required to use the Microsoft Project ODBC driver on your system.
Is the Microsoft Project ODBC driver 32-bit or 64-bit?
The Microsoft Project ODBC driver is available in both 32-bit and 64-bit binaries. The Microsoft Project driver installer will allow you to install both options, and you can select the ODBC driver binary that is appropriate for the system where you intend to use the driver.
Does pyODBC work with Microsoft Project?
Absolutely. The Microsoft Project ODBC driver seamlessly supports pyODBC connectivity. For example, check out this article on our online knowledgebase that demonstrates how you can connect to Microsoft Project from PyCharm using pyODBC and the Microsoft Project ODBC driver.
However, besides ODBC support, we also provide native Python data connectivity for Microsoft Project. To learn more, check out the Microsoft Project Python Connector online.
Does the ODBC connector support ARM64 devices?
Yes, our ODBC connector supports ARM64 Windows.
Download the Microsoft Project ODBC Driver today!
Get the latest Microsoft Project ODBC Drivers for Windows, Linux, and macOS. Install in minutes and connect your Microsoft Project data to Power BI, Tableau, and more.
