Microsoft Project Power BI Connector

Easily connect Microsoft Power BI with live Microsoft Project data for up-to-date visual analysis and reporting.

  • Real-Time Data Access (DirectQuery)
  • Full Metadata Discovery
  • Robust SQL-92 Support

  download   buy now



 Certified Data Connectivity



Connect Microsoft Power BI to Microsoft Project

Our Power BI Connectors support a new era of real-time analytics. The Microsoft Project Connector for Power BI has been engineered and optimized for live access to Microsoft Project data.

Full Metadata Discovery

The Microsoft Project Connector exposes rich metadata, critical for automated data exploration and discovery. Includes intelligent rowscan, type detection, relationship exploration and support for unstructured data.

Robust SQL-92 Engine

Built on a rich SQL-92 engine with support for bulk operations, push-down, client functions, and aggregation, our connectors seamlessly handle even the most complex queries from modern BI & Reporting.

Unmatched Performance

With optimized performance down to the socket level, our connectors offer unmatched performance. Read and write speeds over twice as fast as other SaaS, NoSQL & Big Data connectivity solutions.

Complex Query Processing

The CData Microsoft Project Connector contains an embedded SQL Engine that pushes supported SQL operations to the data source and processes unsupported operations client-side (Query Folding).

  • Issue complex queries using SQL-92 compliant operations and clauses.
  • Leverage server-side data processing for supported operations.
  • Build new relationships and custom datasets.

High-Performance Data Delivery

Our Microsoft Project Power BI Connector is capable of delivering exceptional real-time data access. All of our Power BI Connectors are based on a highly-efficient query engine that has been optimized down to the socket level with streaming and compression capabilities.

  • Enable real-time analytics through unmatched data processing.
  • Request data as quickly as possible using server-side paging and bulk capabilities.

Popular Power BI Videos:

CData Power BI Connector Overview

Download the Microsoft Project Connector


Building custom dashboards & reports that connect with live Microsoft Project data has never been easier. Download the CData Power BI Connector for MS Project now, and get connected.


  Download Now