Create a simple Mule Application that uses HTTP and SQL with CData JDBC drivers to create a JSON endpoint for Microsoft Project data.
The CData JDBC Driver for MS Project connects Microsoft Project data to Mule applications enabling read , write, update, and delete functionality with familiar SQL queries. The JDBC Driver allows users to easily create Mule applications to backup, transform, report, and analyze Microsoft Project data.
This article demonstrates how to use the CData JDBC Driver for MS Project inside of a Mule project to create a Web interface for Microsoft Project data. The application created allows you to request Microsoft Project data using an HTTP request and have the results returned as JSON. The exact same procedure outlined below can be used with any CData JDBC Driver to create a Web interface for the 200+ available data sources.
- Create a new Mule Project in Anypoint Studio.
- Add an HTTP Connector to the Message Flow.
- Configure the address for the HTTP Connector.
- Add a Database Select Connector to the same flow, after the HTTP Connector.
- Create a new Connection (or edit an existing one) and configure the properties.
- Set Connection to "Generic Connection"
- Select the CData JDBC Driver JAR file in the Required Libraries section (e.g. cdata.jdbc.microsoftproject.jar).
- Set the URL to the connection string for Microsoft Project
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
Built-in Connection String Designer
For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.
java -jar cdata.jdbc.microsoftproject.jar
Fill in the connection properties and copy the connection string to the clipboard.
- Set the Driver class name to cdata.jdbc.microsoftproject.MicrosoftProjectDriver.
- Click Test Connection.
- Set the SQL Query Text to a SQL query to request Microsoft Project data. For example:
SELECT ProjectName, ProjectActualCost FROM Projects
- Add a Transform Message Component to the flow.
- Set the Output script to the following to convert the payload to JSON:
%dw 2.0 output application/json --- payload
- To view your Microsoft Project data, navigate to the address you configured for the HTTP Connector (localhost:8081 by default): http://localhost:8081. The Microsoft Project data is available as JSON in your Web browser and any other tools capable of consuming JSON endpoints.
At this point, you have a simple Web interface for working with Microsoft Project data (as JSON data) in custom apps and a wide variety of BI, reporting, and ETL tools. Download a free, 30 day trial of the JDBC Driver for Microsoft Project and see the CData difference in your Mule Applications today.