Rapidly Develop Microsoft Project-Driven Apps with Active Query Builder

Ready to get started?

Download for a free trial:

Download Now

Learn more:

MS Project ODBC Driver

The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity.

Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.



Leverage the Active Query Builder SQL interface builder and the ease of .NET data access to create data-driven WinForms and ASP.NET apps.

Write standard .NET to expose Microsoft Project data through an SQL interface: Active Query Builder helps developers write SQL interfaces; the CData ODBC Driver for Microsoft Project enables standards-based access to Microsoft Project. This integration uses the Microsoft ADO.NET Provider for ODBC as a bridge between the ODBC Driver and the Active Query Builder objects to build a visual SQL composer.

Connect to Microsoft Project as an ODBC Data Source

If you have not already, first specify connection properties in an ODBC DSN (data source name). This is the last step of the driver installation. You can use the Microsoft ODBC Data Source Administrator to create and configure ODBC DSNs.

The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, you will need to specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

Use SQL to Interact with Microsoft Project

Follow the steps below to create a WinForms visual query builder.

  1. In a new Windows Forms project, drag the QueryBuilder from the Toolbox onto the form.
  2. Add a reference to ActiveQueryBuilder.ODBCMetadataProvider.
  3. Add an OdbcConnection and set the connection string to the DSN that you created in the first section. OdbcConnection connection = new OdbcConnection(); connection.ConnectionString = "DSN=MicrosoftProject"
  4. Initialize ODBCMetadataProvider and GeneralSyntaxProvider instances and set the Connection property of the ODBCMetadataProvider object to the OdbcConnection. GenericSyntaxProvider syntaxProvider = new GenericSyntaxProvider(); ODBCMetadataProvider metadataProvider = new ODBCMetadataProvider(); metadataProvider.Connection = connection;
  5. Set the corresponding MetadataProvider and SyntaxProvider properties of the QueryBuilder object. queryBuilder1.MetadataProvider = metadataProvider; queryBuilder1.SyntaxProvider = syntaxProvider;
  6. Call the InitiatelizeDatabaseSchemaTree method of the QueryBuilder class to retrieve Microsoft Project metadata and generate a tree view of Microsoft Project tables. queryBuilder1.InitializeDatabaseSchemaTree();
  7. After creating the QueryBuilder, connect it to a TextBox or, as we use, the ActiveQueryBuilder SQLTextEditor: Drag and drop an SQLTextEditor onto the designer.

  8. Add the following code to the Validating event for the SQLTextEditor: private void sqlTextEditor1_Validating(object sender, CancelEventArgs e) { try { // Update the query builder with manually edited query text: queryBuilder1.SQL = sqlTextEditor1.Text; } catch (SQLParsingException ex) { e.Cancel = true; // Set caret to error position sqlTextEditor1.SelectionStart = ex.ErrorPos.pos; // Report error MessageBox.Show(ex.Message, "Parsing error"); } }
  9. Add the following to the SQLUpdated event: private void queryBuilder1_SQLUpdated(object sender, EventArgs e) { sqlTextEditor1.Text = queryBuilder1.FormattedSQL; }
  10. You can now build queries visually: Double-click a table in the Columns Pane Area and an entity/relationship diagram is displayed in the Query Building Area. Columns that you select in the diagram are added to the query.